Waverley School
New Main Entrance

Main Entrance at Waverley School

Waverley School is a highly regarded independent preparatory school for children aged from 3 months to 11 years. Known for its excellent learning environment, the school wanted its main entrance to better reflect the quality of the facilities and the experience provided for pupils, parents and visitors.

360 Commercial Environments was appointed to design and deliver a new entrance as part of a school construction project, creating an attractive, secure and practical entrance while minimising disruption to the daily operation of the school.

The Project

As experienced school building contractors, we designed and built a modern portico-style entrance using as much of the existing structure as possible. Retaining the original framework helped reduce both costs and the overall impact of the works while still delivering a significant improvement to the appearance and functionality of the building.

The project formed part of a wider programme of school building improvements, with every aspect carefully planned to ensure the school remained fully operational throughout the construction works.

School Entrance Construction

The completed school entrance construction project included a range of internal and external improvements designed to enhance security, accessibility and the overall appearance of the building.

Works included:

  • Retaining the existing structure to reduce disruption and construction costs
  • Installing new external and internal glazed doors to increase natural light
  • Fitting a new access control system to improve site security
  • Improving external drainage and replacing the paved entrance
  • Installing new energy-efficient lighting with dawn-to-dusk controls and timeclock operation
  • Repainting the existing UPVC windows and fascia to complement the new entrance

The result is a brighter, more welcoming entrance that provides a practical first impression while meeting the operational needs of a busy educational environment.

Construction Project Management

Delivering education construction projects requires careful planning, particularly when work takes place on a live school site. Our team coordinated every stage through detailed construction project management, ensuring work progressed safely, efficiently and with minimal disruption to pupils, staff and visitors.

By planning each phase carefully, we were able to complete the programme within just six weeks while maintaining high standards of workmanship and site safety throughout.

Education Construction in Waverley

This project demonstrates our experience in education facility construction, delivering practical building solutions that improve educational environments without affecting day-to-day operations.

As a trusted, professional and reliable local contractor, we continue to deliver school construction and refurbishment projects for schools across Waverley, Reading and the surrounding areas, combining practical expertise with careful planning and quality workmanship.